Screenshot 2023-05-10 at 4.30.18 PM.png

RC L-1011 Airliner Kit Development and Build Status

 

πŸ”΅ = Active / In Production

βšͺ️ = In Queue

🟒 = Completed

🟑 = Revisions Required

🟣 = Redo Required

πŸ”΄ = Failed / Canceled

⚫️ = On Hold

Current and Most Recent Activity:

Wings

  • πŸ”΅ Recording YouTube Build Video

  • 🟑 Assembly Manual

  • 🟒 Wings - Design & Final Preparation

    • 🟒 Wing Frame

    • 🟒 Main Flaps Revisions & Prototyping

    • 🟒 Inboard Aileron Revisions & Prototyping

    • 🟒 Outboard Flaps Revisions & Prototyping

    • 🟒 Outboard Aileron Revisions & Prototyping

    • 🟒 Engine Cowlings Manufactured

    • 🟒 Engine Pylons Manufactured

    • 🟒 Wing Mounts Design

    • 🟒 Landing Gear Mounts

Designing Flap Tracks in CAD

Flap Tracks for Scale Model RC L-1011 Airliner

3D Printed Flap Tracks

3D Printed Flaps Prototype


Airframe No. 1

Center Fuselage

  • 🟒 Fusion 360 Model Design

  • 🟒 Assembly Manual Prepared - Review Manual

  • 🟒 YouTube Build Episode - Watch it Now

  • 🟒 Model Cut Sheets Prepared

  • 🟒 Wood Airframe Frame Laser Cut

  • 🟒 Frame Assembled

  • 🟒 Wing Mounts fit check

  • 🟒 Access Hatch Installed

  • 🟒 Center Fuselage to Forward Fuselage Section Attachment Fit Confirmed

  • Core Electronics Installed

  • Center Fuselage to Aft Fuselage Section Attachment Fit confirmed

  • Cover & Prepare for Finishing

  • Main Gear Doors Installed & Electronic Articulation

  • Ready for Ground Testing

  • Ground Testing Complete

  • Livery Completed

  • Ready for Flight


Forward Fuselage

Building a Big Scale Model RC Airliner

Watch the Forward Fuselage build episode on YouTube

  • 🟒 Fusion 360 Model Design - Read More

  • 🟒 Model Cut Sheets Prepared

  • 🟒 Assembly Manual Prepared

  • 🟒 YouTube Build Episode

  • 🟒 3D Printed Mounts for Electronics Plate

  • 🟒 3D Printed Hatch Hinges & Latch

  • 🟒 Wood Airframe Frame Laser Cut

  • 🟒 Frame Assembled

  • 🟒 Access Hatch Installed

  • 🟒 3D Printed Nose Mold Plug Prototype 1 & 2

  • 🟒 Forward to Center Fuselage Section Attachment Fit

  • Nose Mold Created

  • Nose Gear Installed

  • Nose Gear Electronic Articulation

  • Nose Gear Doors & Electronic Articulation

  • Cover & Prepare for Finishing

  • Ready for Ground Testing

  • Ground Testing Complete

  • Livery Completed

  • Ready for Flight


Empennage / Aft Fuselage

Watch the Tail Section Build Episode.

3D Printed L-1011 Airliner S-Duct Mold
  • 🟒 Fusion 360 Model Design

  • 🟒 YouTube Build Episode

  • 🟒 Assembly Manual Prepared

  • 🟒 Airframe Assembled

  • 🟒 Airframe DXF Cut Sheets Prepared

  • 🟒 3D Printed Horns, Brackets & Joints

  • 🟒 S-Duct Mold 3D Printed

    • 🟒 Sections 1 & 2 (39hrs)

    • 🟒 Sections 3 & 4 (38hrs)

    • 🟒 Sections 5 & 6 (33hrs)

  • 🟒 3D Printed Stabilator Mounts

  • 🟒 3D Printed S-Duct Mold Plug

  • 🟒 S-Duct Mold Patterns Sanded and Waxed

  • 🟒 3D Printed Rudder Mold

  • 🟒 Rudder Mold Patterns Sanded and Waxed

  • 🟒 3D Printed Engine #2 Intake Mold

  • ⚫️ 3D Print Stabilator Mold

  • 🟒 Wood Airframe Frame Laser Cut

  • 🟒 Cast 2 Part Fiber Rudder

  • 🟒 Cast 2 Part S-Duct

  • 🟒 Carbon Fiber Rudder Made & Ready for Install

  • 🟒 Carbon Fiber S-Duct Made & Ready for Install

  • 🟒 S-Duct Installed

  • 🟒 Center Fuselage Section Align & Fit Confirmed

  • 🟒Rudder Installed

  • 🟒Rudder and Stabilator FrSKY Servos installed

  • Rudder Servo Articulation Tested

  • 🟒 Stabilator Assembled Ready for Install

  • 🟒 Stabilator Mounted

  • Stabilator Servo Articulation Tested

  • Engine 2 Installed / Mounted

  • Cover & Prepare for Finishing

  • Ready for Ground Testing

  • Ground Testing Complete

  • Livery Completed

  • Ready for Flight

Wings

RC Airliner Wing Frame Prototype

Finished the Wing Prototype!

  • 🟒 Fusion 360 Wing Model Design (Finalizing)

  • πŸ”΅ YouTube Build Episode

  • 🟒 Wing Mounts 3D printed Ready for Install

  • 🟒 Engine Nacelles Designed

  • 🟑 Assembly Manual Prepared

  • 🟒 Laser Cut Sheets Prepared

  • 🟒 Starboard Wing Wood Structure Assembled

  • 🟒 Port Wing Wood Structure Assembled

  • 🟒 Construct Flaps

  • 🟒 Construct Ailerons

  • 🟒 Starboard Flaps Ready to Install

  • 🟑 Port Flaps Ready to Install

  • 🟒 Starboard Ailerons Ready to Install

  • 🟑 Port Flaps Ready to Install

  • βšͺ️ Starboard Flaps Installed & Electronic Articulation

  • βšͺ️ Starboard Ailerons Installed & Electronic Articulation

  • βšͺ️ Port Flaps Installed & Electronic Articulation

  • βšͺ️ Port Ailerons Installed & Electronic Articulation

  • βšͺ️ Wing to Fuselage Mounting Fit

  • πŸ”΅ Finalize Wiring and Fuselage Connection Points

  • Cover Wings & Prepare for Finishing

  • Ready for Ground Testing

  • Final Paint & Details

  • Wings Ready for Flight


Engines

  • πŸ”΅ Fusion 360 Engine Assembly Model Design

  • 🟒 Engine #2 Housing

  • 🟒 Engine Nacelles 3D Printed Prototype 1 - Read More

  • 🟒 Engine Cowlings Manufactured

  • 🟒 Engine Pylons Manufactured

  • Engine Pylons Ready for Install

  • Engine Pylons Installed

  • EDF Assembly Fit Test

  • Engine Nacelles Ready for Install

  • Engine Nacelles Installed

  • Ready for Ground Testing

  • Final Paint and Finishing details

  • Ready for Flight


Main Landing Gear

  • 🟑 Fusion 360 Model Design

  • 🟒 3D Printed & Assembled Prototype 1 - Read More

  • 🟒 Gear Mounts Designed Prototype 1

  • YouTube Build Episode

  • 🟒 Aluminum Piston Turning

  • 🟒 Sock Assembly

  • 🟒 Main Strut Carbon Print & Build

  • Wheels & Wheel Mounting Assembly

  • πŸ”΅ Rubber Tires Printed

  • Assembly Manual Prepared

  • πŸ”΅ Main Gear Electronic Articulation

  • Main Gear Installed

  • Gear Assembled / Ready for Install

  • Ready for Ground Testing

  • Ground Testing Complete

  • Ready for Flight


Nose Gear

  • 🟒 Fusion 360 Model Design

  • 🟑 Assembly Manual Prepared

  • 🟒 Gear Structure 3D Printed Prototype 1 - Read More

  • πŸ”΄ Prototype 1 - Housing/Mount 3D printed

  • 🟒 Prototype 2 - Mounting Assembly 3D Printed

  • 🟒 Gear mounts redesigned

  • 🟑 Gear Structure Redesigned

  • 🟑 3D Printing Gear Structure

  • YouTube Build Episode

  • Gear Assembled / Ready for Install

  • Ready for Ground Testing

  • Ground Testing Complete

  • Ready for Flight


Electronics

  • YouTube Episode

  • 🟒 Radio / Transmitter

  • 🟒 Receivers Acquired

  • 🟒 Flight Controller Acquired

  • 🟒 Aileron Servo Acquired

  • 🟒 Rudder Servo Acquired - Read More

  • 🟒 Stabilator Servo Acquired - Read More

  • 🟒 Nose Gear Bay Doors Servos Acquired

  • 🟒 Nose Gear Steering Servo Acquired

  • Flap Servos Acquired

  • Main Gear Servos Acquired

  • Power System Acquired

  • ESC (Electric Speed Controllers) Acquired

  • Propulsion (EDFs) Acquired

  • Lighting System Acquired

  • Lighting System Installed

  • Propulsion System Tested

  • System Wiring complete

  • Full Electronics Systems Programmed

  • Ready for Ground Testing

  • Ground Testing Complete

  • Ready For Flight